TQR Line Cook Closing Checklist

Standard: Physical, ocular, and probe verification only — no verbal sign-offs.
Window: Begins immediately after final ticket is plated; sign-off required prior to line dismissal.


1. Food Storage, Breakdown & CCP Safeguards

Parameter Operational / Safety Spec Cook Verified Lead Initial
Hot Well Depletion & Cooling Steam table hot wells powered off, drained, and wiped dry; hot foods rapidly cooled (ice bath / shallow pans to ≤ 40°F within guidelines) [  ] Temp: _____°F ______
Cold Rail Breakdown Rail pans consolidated into clean, shallow lexans/inserts; no hot foods placed into cold wells [  ] Pass ______
Labeling & FIFO Rotation 100% of carryover items wrapped, labeled with Day-Dots, item name, and date; rotated behind existing prep [  ] Pass ______
Raw Protein Storage Meats staged flat on perforated drip trays in drawers or walk-in (zero standing liquid); strictly stored below cooked/ready-to-eat product [  ] Pass ______
Refrigeration Ambient Audit Reach-in and low-boy cabinet temperatures verified holding ≤ 38°F [  ] Temp: _____°F ______

2. Station-by-Station Equipment Decommissioning

Sauté Station

  • ▢ Range Tops & Drip Pans: Burners turned off, grates removed and degreased; burner drip trays scraped, emptied, and sanitized.
  • ▢ Ovens: Internal racks wiped down; oven doors cleaned; pilot lights verified stable (or switched off per building SOP).
  • ▢ Squeeze Bottles & Fats: Dispenser tips scrubbed free of carbon build-up; ambient cooking oils sealed; perishable blends returned to walk-in below 40°F.
  • ▢ Pan Racks & Stainless: Used pans completely cycled to dish pit; stainless backsplash and rail wiped down with degreaser and sanitized.

Grill & Broiler Station

  • ▢ Broiler / Pit De-escalation: Gas/broiler shut down; mesquite/charcoal coals safely extinguished or raked per kitchen safety protocol.
  • ▢ Grate Scraping: Grates aggressively wire-brushed down to bare metal while warm; carbon residue cleared.
  • ▢ Catch Trays: Grease drip troughs and pull-out crumb drawers scraped, emptied into designated grease receptacles, and scrubbed.
  • ▢ Finishing Lamp Area: Carving/resting boards scrubbed and sanitized; heat lamp turned off.

Fry Station

  • ▢ Vat Shutdown & Cover: Fryer power/gas shut off; oil allowed to drop below handling hazard temp before filtration.
  • ▢ Oil Filtration: Vats skimmed, drained through filter cones into catch bins, sediment flushed, and oil restored or logged for waste dump.
  • ▢ Heating Elements & Vats: Walls scrubbed free of gummed grease; exterior stainless wiped down; night covers placed securely over vats.
  • ▢ Fry Dump Station: Dump pan and racks removed and sent to dish pit; heat lamp turned off; seasoning salt dredge wiped down and capped.

Garde Manger / Pantry & Cold Rails

  • ▢ Cold Wells & Ice Drains: Ice melted with hot water; well inserts washed, sanitized, and wiped bone-dry; drain lines cleared.
  • ▢ Dressings & Emulsions: Spouts cleaned, rims wiped; returned to walk-in under refrigeration.
  • ▢ Cutting Boards: High-density polyethylene boards scrubbed with bleach/degreaser solution, sanitized, and stored vertically to air-dry (no pooling moisture).

3. Sanitation, Floors & Prep Restock Audit

  • ▢ Ticket Machine & Wheel: Expo counter sanitized; order rail cleared; ticket printers wiped down and restocked with fresh receipt paper rolls.
  • ▢ Utensil Clearance: Every station tong, spatula, fish turner, and bain-marie sent to dish pit for high-temp sanitizing.
  • ▢ Chemical & Bucket Drain: Sanitizer buckets dumped, wiped down, and stacked to air-dry; test strips and chemical bottles restocked.
  • ▢ Next-Shift Restock Log: Prep par shortages and depletion log filled out for the morning opening prep crew.
  • ▢ Floor Sweep & Mop: Anti-fatigue floor mats removed and power-washed; line floor swept behind all equipment lines, deck-scrubbed, squeegeed into floor drains, and dry-mopped.
  • ▢ Trash & Linens: Station trash cans emptied, rinsed clean, and relined with fresh bags; soiled linen hampers tied and staged at laundry dispatch.

4. Line Close Sign-Off

Station Area Closing Cook Status Lead Verification Notes
Sauté & Hot Line [  ] Pass [  ] Fail
Grill / Broiler [  ] Pass [  ] Fail
Fry Station [  ] Pass [  ] Fail
Pantry / Garde Manger [  ] Pass [  ] Fail
Expediter Window [  ] Pass [  ] Fail

Kitchen Supervisor / Lead Sign-Off: ___________________________
Time Verified: _________ AM/PM

Leave a Reply